ISO 9001 EN 10.90

EON

Gardanne-France

Project details

Turnkey Biomass Power Station
-       Logs and trunks crushing system
-       1 curvoduc™  of 540 m of length with curve of 800 m
-       4 trucks unloading station ( 800 m3/h )
-       1 sampling station
-       Screening equipment
-       Storage building with a capacity of 25000 + 5000 m3 ( Flowrate 3200 m3/h)
-       Automatic extraction by screw with a maximum flowrate of 900 m3/h
-       One reception station for class B Biomass with treatment
-       Boiler feeding

Turn-key included the civil works and roads, de-dusting system, detection and fire protection equipment.

GPS Location

Learn more

Similar projects